The project entailed four new build, four-storey townhouses within the student residential village, located in the existing Ashcroft development at Birmingham’s Edgbaston campus. The complex roof design required a robust ventilation solution. Permavent APEX air open and vapour permeable membrane was specified to provide the ventilation requirements within the complicated roof space. These new build properties also featured integrated solar panels and roof pitches exceeding 50 degrees.
More information about this project can be seen by visiting our Case Study: Pritchatts Park Village, University of Birmingham – Permavent